All subjects · Accounting · WAC12 Corporate and Management Accounting

Cost behaviour: fixed, variable, semi-variable and semi-fixed costs

Edexcel IAL Accounting · WAC12 Corporate and Management Accounting

Break-even analysis and marginal costing depend on classifying costs by how they behave as output changes. Examiners report that misclassifying costs as fixed or variable loses marks in break-even questions.

Practise this in the app: instant marking and a fix for every mistake. Free, no email needed to start.

Practise this lesson

Four types of cost

TypeBehaviourExamples
FixedTotal stays the same as output changes (within the relevant range); cost per unit falls as output risesRent, insurance, salaries, depreciation (straight line), loan interest
VariableTotal rises in direct proportion to output; cost per unit is constantRaw materials, piece-rate labour, sales commission, packaging, fuel per mile
Semi-variableA fixed element plus a variable element: a straight line that starts above zeroTelephone or electricity with a standing charge; salesperson on basic pay plus commission
Semi-fixed (stepped)Fixed over a range of output, then jumps to a new levelSupervisors (one per 10 workers), an extra delivery vehicle, extra coaches for a tour company

Do not confuse the two 'semi' costs

Semi-variable = straight line rising from a fixed starting point. Semi-fixed = steps. The June 2025 examiners had to remind candidates that semi-fixed costs rise in steps, unlike semi-variable costs, which rise in a straight line.

Selling price and net profit

Read the question carefully for how many people or items a cost applies to: an October 2022 question had five staff, not one.

Worked example

A café has rent of £2,000 a month, a manager paid £2,400 a month, food costing £1.80 per meal, and electricity of £150 a month plus £0.10 per meal. It sells 4,000 meals at £6.50. Calculate net profit.

  1. Fixed costs = 2,000 + 2,400 + 150 = £4,550
  2. Variable cost per meal = 1.80 + 0.10 = £1.90
  3. Revenue = 4,000 x 6.50 = £26,000; variable costs = 4,000 x 1.90 = £7,600
  4. Net profit = 26,000 - 7,600 - 4,550

Answer: £13,850

Key idea: Fixed costs do not change with output; variable costs change in proportion; semi-variable = fixed part + variable part; semi-fixed = steps. Profit = (price - variable cost per unit) x units - fixed costs.

Check yourself

  1. Fixed costs are £18,000 and variable cost is £7 per unit. Calculate the total cost of making 3,500 units.
    Show answer

    £42500. 18,000 + 24,500 = £42,500.

  2. Selling price £22, variable cost £13 per unit, fixed costs £40,500. Calculate net profit when 6,000 units are sold.
    Show answer

    £13500. 9 x 6,000 - 40,500 = £13,500.

  3. A shop employs 5 staff, each paid £1,800 a month, and pays rent of £3,000 a month. What are its monthly fixed costs?
    Show answer

    £12000. 5 x 1,800 + 3,000 = £12,000.

  4. Fixed costs are £24,000. What is the fixed cost per unit at 8,000 units?
    Show answer

    £3.00. 24,000 / 8,000 = £3.00 per unit.

  5. A mobile phone contract costs £15 a month plus 5p per minute. What type of cost is it?
    • Semi-fixed
    • Semi-variable
    • Fixed
    • Variable
    Show answer

    Semi-variable. A fixed element plus a variable element.

  6. A coach company needs one extra coach for every 50 passengers. What type of cost is the coach hire?
    • Semi-variable
    • Variable
    • Fixed at all levels of output
    • Semi-fixed (stepped)
    Show answer

    Semi-fixed (stepped). The cost jumps each time another 50 passengers are added.

  7. As output rises, what happens to fixed cost per unit?
    • It rises
    • It falls
    • It stays the same
    • It becomes variable
    Show answer

    It falls. The same total is spread over more units.

Practise with instant feedback

Sources

Last updated 8 November 2026. Spotted a mistake? Tell us.