All subjects · Biology · WBI16 Practical Skills in Biology II
Skills applied: CP11 ecology of a habitat
Edexcel IAL Biology · WBI16 Practical Skills in Biology II
CP11 is the field practical. Questions test sampling strategy, measuring abundance and abiotic factors, sample size, and Spearman's rank analysis.
Sampling strategy
Method recap (see Core practical 11, Unit 4):
- Random sampling (random number coordinates on a grid) when an area looks uniform; avoids bias.
- Systematic sampling along a transect (line or belt) when a factor changes across the area, such as distance from a hedge or up a shore; place quadrats at regular intervals.
- Enough quadrats: plot a running mean of species number or cover against number of quadrats; stop when it levels off.
Measuring abundance and abiotic factors
- Percentage cover (estimate area covered, often using a 100-square grid quadrat), density (individuals per m²), frequency (percentage of quadrats or squares containing the species), or an abundance scale such as ACFOR.
- Abiotic factors: light (light meter), soil moisture (moisture meter or mass loss on drying), soil pH (pH probe or indicator), temperature, wind speed, salinity.
- Take abiotic readings at the same time as each quadrat and calibrate meters.
- Percentage cover is subjective: use the same observer or grid squares.
Analysis
- Kite diagrams show changing abundance along a transect.
- Spearman's rank tests correlation between an abiotic factor and abundance at the same quadrats.
- Chi-squared tests whether a species is spread evenly between zones.
- Mean density = total individuals ÷ total area sampled.
- Limitations: abiotic factors vary over the day; several factors change together; small sample; identification errors.
Worked example
12 quadrats of 0.25 m² contained 18, 22, 15, 20, 19, 25, 16, 21, 17, 23, 24, 20 daisies. Estimate the population in a 50 m² field.
- Total = 240 daisies in 12 x 0.25 = 3 m²
- Density = 80 per m²
- Population = 80 x 50 = 4000
Answer: About 4000 daisies.
Check yourself
- When should a belt transect be used rather than random quadrats?
- When the area is uniform
- When there is no time
- When an abiotic factor changes across the area, such as from shade to open ground
- When only one species is present
Show answer
When an abiotic factor changes across the area, such as from shade to open ground. Transects sample along a gradient.
- How are random quadrat positions chosen?
- Using random number coordinates on a grid laid over the area
- Throwing the quadrat over your shoulder
- Placing them where most plants grow
- Placing them in a straight line
Show answer
Using random number coordinates on a grid laid over the area. Random coordinates avoid bias.
- 8 quadrats, each 0.5 m², contain a total of 96 snails. Calculate the mean density per m².
Show answer
24 per m². Area = 4 m²; 96 / 4 = 24 per m².
- A species was present in 14 of 40 quadrats. Calculate its percentage frequency.
Show answer
35 %. 14 / 40 x 100 = 35%.
- Along a transect of 7 quadrats, Σd² for soil moisture against moss cover is 6. Calculate rₛ to 3 decimal places.
Show answer
0.893. 1 - 36 / 336 = 0.893.
- For the moss data, rₛ = 0.893 with 7 pairs (critical value 0.786 at p = 0.05). What is the conclusion?
- Accept the null hypothesis: no significant correlation
- Reject the null hypothesis: a significant positive correlation between soil moisture and moss cover
- There is a significant negative correlation
- There is a significant difference between means
Show answer
Reject the null hypothesis: a significant positive correlation between soil moisture and moss cover. 0.893 > 0.786.
- How can you decide whether enough quadrats have been used?
- Stop after three quadrats
- Use one large quadrat
- Count until you are tired
- Plot a running mean against number of quadrats and check it has levelled off
Show answer
Plot a running mean against number of quadrats and check it has levelled off. A stable running mean shows the sample is representative.
Sources
- Pearson Edexcel International Advanced Level in Biology specification (XBI11/YBI11, first teaching 2018): Unit 3, Unit 6 and Appendix 6 mathematical skills
- Pearson WBI16/01 specimen paper (2019) with Spearman's rank critical values (via Physics & Maths Tutor)
Last updated 8 November 2026. Spotted a mistake? Tell us.