All subjects · Information Technology · WIT11 2 hour written exam on IT systems, networks and data
IT systems: components, decomposition, design and fitness for purpose
Edexcel IAL Information Technology · WIT11 2 hour written exam on IT systems, networks and data
Spec points 4.1.1 to 4.1.4: the components of an IT system (hardware, software, processes, people), decomposing a system into sub-systems, designing a system to meet requirements, and judging fitness for purpose.
Components of an IT system
| Component | Meaning | Example: a library loans system |
|---|---|---|
| Hardware | The physical devices | Barcode scanners, PCs, server, self-service kiosks, receipt printers |
| Software | The programs and data structures | Loans database, operating systems, web catalogue |
| Processes | The procedures and tasks carried out, by people or the system | Issue a book, return a book, send overdue reminders, add a new member |
| People | The users and others involved | Librarians, members, IT support staff |
Decomposition and design
Decomposition breaks a complex system into smaller sub-systems and then into components, each easier to understand, design, build and test. A library system might decompose into membership, catalogue, loans and reporting sub-systems; loans decomposes into scanning, checking the member's status, updating the record and printing a receipt.
To design a system from components: identify the user requirements (inputs, processes, outputs, storage, users, constraints such as budget); choose hardware and software for each sub-system; show how data moves between components with diagrams (system or information flow diagrams, dataflow diagrams, flowcharts) using the symbols in Appendix 7 of the specification; consider security, usability, cost and scalability. In an information flow diagram, use appropriately labelled shapes and arrows to show what information passes between people, departments and systems; the June 2025 report noted candidates confusing these with DFD symbols.
Fitness for purpose
A system is fit for purpose if it does what it was designed to do for its users. Judge it against success criteria set before development starts (from the requirements), for example:
- it meets every functional requirement;
- it passes testing against acceptance criteria;
- performance (speed, response time, capacity);
- reliability and robustness (few failures, no bugs, resilient to attack, free of malware);
- usability and accessibility for the actual users;
- cost within budget; legal compliance (data protection).
The June 2024 examiner report stressed that criteria must be set at the start, not invented at the end.
Worked example
Decompose an online takeaway ordering system into four sub-systems.
- Customer accounts (register, log in, saved addresses).
- Menu and ordering (browse menu, basket, checkout).
- Payment (card processing, refunds).
- Kitchen and delivery (order queue for the kitchen, driver allocation, tracking).
Answer: Accounts, ordering, payment, kitchen and delivery: each can be designed and tested separately.
Check yourself
- Which is a 'process' component of an IT system?
- Issuing a book to a member
- A barcode scanner
- The database software
- A librarian
Show answer
Issuing a book to a member. Processes are the tasks and procedures.
- Why is a system decomposed into sub-systems?
- To make the system more expensive
- So that it needs more hardware
- Each part is smaller, so it is easier to design, build and test
- To remove the need for users
Show answer
Each part is smaller, so it is easier to design, build and test. Smaller problems are easier to solve.
- When should the criteria for judging fitness for purpose be set?
- Before development starts, from the requirements
- After the system is in use
- Only if users complain
- During disposal
Show answer
Before development starts, from the requirements. The examiner report stressed setting criteria at the start.
- Give two measures of the fitness for purpose of an IT system.
Show answer
It meets all of the user requirements, and it passes testing against acceptance criteria with no bugs.. Any two distinct measures.
- In a hospital appointments system, which is the 'people' component?
- The appointments database
- Receptionists and patients
- Booking an appointment
- Touchscreen check-in kiosks
Show answer
Receptionists and patients. People are the users and others involved.
- What does an information flow diagram mainly show?
- The exact SQL used by a database
- The voltage in a network cable
- The order of steps in a loop with decisions
- What information passes between people, departments and systems
Show answer
What information passes between people, departments and systems. It shows labelled flows of information between parts of a system.
Sources
- Pearson Edexcel International Advanced Level in Information Technology specification (2018), Unit 1
- Pearson Edexcel IAL Information Technology WIT11/01 question paper, June 2024
- Pearson Edexcel IAL Information Technology WIT11/01 examiner report, June 2024
- Pearson Edexcel IAL Information Technology WIT11/01 examiner report, June 2025
Last updated 8 November 2026. Spotted a mistake? Tell us.