All subjects · Information Technology · WIT11 2 hour written exam on IT systems, networks and data

IT systems: components, decomposition, design and fitness for purpose

Edexcel IAL Information Technology · WIT11 2 hour written exam on IT systems, networks and data

Spec points 4.1.1 to 4.1.4: the components of an IT system (hardware, software, processes, people), decomposing a system into sub-systems, designing a system to meet requirements, and judging fitness for purpose.

Practise this in the app: instant marking and a fix for every mistake. Free, no email needed to start.

Practise this lesson

Components of an IT system

ComponentMeaningExample: a library loans system
HardwareThe physical devicesBarcode scanners, PCs, server, self-service kiosks, receipt printers
SoftwareThe programs and data structuresLoans database, operating systems, web catalogue
ProcessesThe procedures and tasks carried out, by people or the systemIssue a book, return a book, send overdue reminders, add a new member
PeopleThe users and others involvedLibrarians, members, IT support staff

Decomposition and design

Decomposition breaks a complex system into smaller sub-systems and then into components, each easier to understand, design, build and test. A library system might decompose into membership, catalogue, loans and reporting sub-systems; loans decomposes into scanning, checking the member's status, updating the record and printing a receipt.

To design a system from components: identify the user requirements (inputs, processes, outputs, storage, users, constraints such as budget); choose hardware and software for each sub-system; show how data moves between components with diagrams (system or information flow diagrams, dataflow diagrams, flowcharts) using the symbols in Appendix 7 of the specification; consider security, usability, cost and scalability. In an information flow diagram, use appropriately labelled shapes and arrows to show what information passes between people, departments and systems; the June 2025 report noted candidates confusing these with DFD symbols.

Fitness for purpose

A system is fit for purpose if it does what it was designed to do for its users. Judge it against success criteria set before development starts (from the requirements), for example:

The June 2024 examiner report stressed that criteria must be set at the start, not invented at the end.

Worked example

Decompose an online takeaway ordering system into four sub-systems.

  1. Customer accounts (register, log in, saved addresses).
  2. Menu and ordering (browse menu, basket, checkout).
  3. Payment (card processing, refunds).
  4. Kitchen and delivery (order queue for the kitchen, driver allocation, tracking).

Answer: Accounts, ordering, payment, kitchen and delivery: each can be designed and tested separately.

Key idea: IT system = hardware + software + processes + people. Decompose into sub-systems and components to design and test them. Fitness for purpose is judged against requirements and acceptance criteria set before development.

Check yourself

  1. Which is a 'process' component of an IT system?
    • Issuing a book to a member
    • A barcode scanner
    • The database software
    • A librarian
    Show answer

    Issuing a book to a member. Processes are the tasks and procedures.

  2. Why is a system decomposed into sub-systems?
    • To make the system more expensive
    • So that it needs more hardware
    • Each part is smaller, so it is easier to design, build and test
    • To remove the need for users
    Show answer

    Each part is smaller, so it is easier to design, build and test. Smaller problems are easier to solve.

  3. When should the criteria for judging fitness for purpose be set?
    • Before development starts, from the requirements
    • After the system is in use
    • Only if users complain
    • During disposal
    Show answer

    Before development starts, from the requirements. The examiner report stressed setting criteria at the start.

  4. Give two measures of the fitness for purpose of an IT system.
    Show answer

    It meets all of the user requirements, and it passes testing against acceptance criteria with no bugs.. Any two distinct measures.

  5. In a hospital appointments system, which is the 'people' component?
    • The appointments database
    • Receptionists and patients
    • Booking an appointment
    • Touchscreen check-in kiosks
    Show answer

    Receptionists and patients. People are the users and others involved.

  6. What does an information flow diagram mainly show?
    • The exact SQL used by a database
    • The voltage in a network cable
    • The order of steps in a loop with decisions
    • What information passes between people, departments and systems
    Show answer

    What information passes between people, departments and systems. It shows labelled flows of information between parts of a system.

Practise with instant feedback

Sources

Last updated 8 November 2026. Spotted a mistake? Tell us.