Job costing and batch costing

Edexcel IAL Accounting · WAC11 The Accounting System and Costing

Job costing finds the cost of a single customer order; batch costing finds the cost of a group of identical items made together. Both build up direct costs and absorbed overheads (spec 1.4.12 and 1.4.13).

Practise this in the app: instant marking and a fix for every mistake. Free, no email needed to start.

Practise this lesson

Characteristics of job costing

Job cost sheet

Job 207£
Direct materials1,850
Direct labour: Machining 14 h x £15210
Direct labour: Assembly 20 h x £12240
Direct expenses (special tool hire)150
Prime cost2,450
Overheads: Machining 10 machine hours x £18180
Overheads: Assembly 20 labour hours x £9180
Total cost2,810
Profit (25% mark-up on cost)702.50
Price3,512.50

Batch costing

A batch is a number of identical units made together (500 loaves, 2,000 printed leaflets). The batch is costed like a job, including set-up costs for the batch, then:

cost per unit = total batch cost / number of good units in the batch.

Larger batches spread set-up costs over more units, lowering unit cost, but tie up money in inventory.

Worked example

A batch of 400 units uses materials £3,200, direct labour £2,400 for 160 hours, overheads at £9 per labour hour and set-up costs of £360. Find the cost per unit.

  1. Overheads = 160 x 9 = 1,440.
  2. Total = 3,200 + 2,400 + 1,440 + 360 = 7,400.

Answer: Cost per unit = 7,400 / 400 = £18.50.

Key idea: Job cost = direct materials + direct labour + direct expenses + absorbed overheads; add profit to price it. Batch cost per unit = batch cost / units in the batch.

Check yourself

  1. A job uses materials £640, 12 labour hours at £14 and 5 machine hours. Overheads are absorbed at £22 per machine hour. Calculate the total cost of the job.
    Show answer

    £918. 640 + 168 + 110 = 918.

  2. A job costs £2,810. The business prices jobs to give a 20% margin on the selling price. Calculate the price.
    Show answer

    £3512.50. Cost is 80% of price: 2,810 / 0.8 = 3,512.50. (A 20% margin is the same as a 25% mark-up.)

  3. A batch of 1,200 units costs £5,100 including set-up. Calculate the cost per unit.
    Show answer

    £4.25. 5,100 / 1,200 = £4.25.

  4. Set-up costs are £600 per batch and other costs £3 per unit. Calculate the cost per unit for a batch of 300 units.
    Show answer

    £5.00. (600 + 900) / 300 = £5.00.

  5. Which business is most likely to use job costing?
    • An oil refinery
    • A bakery making thousands of identical loaves continuously
    • A water supply company
    • A firm that builds custom kitchens to each customer's design
    Show answer

    A firm that builds custom kitchens to each customer's design. Each kitchen is a separate, different job.

  6. Which document records the direct labour time spent on a job?
    • Materials requisition
    • Time sheet (job card)
    • Purchase invoice
    • Credit note
    Show answer

    Time sheet (job card). Workers record hours against each job number.