All subjects · Accounting · WAC12 Corporate and Management Accounting

Overhead variances and reconciling standard and actual cost

Edexcel IAL Accounting · WAC12 Corporate and Management Accounting

WAC12 requires two overhead variances: the total variable overhead variance and the total fixed overhead variance. With the material and labour variances they reconcile the standard cost of actual output with the actual cost.

Practise this in the app: instant marking and a fix for every mistake. Free, no email needed to start.

Practise this lesson

Total variable overhead variance

Total variable overhead variance = standard variable overhead for actual output - actual variable overhead.

Standard variable overhead for actual output = actual output x standard variable overhead per unit (often a rate per standard labour hour x standard hours per unit).

Positive is favourable, negative adverse.

Total fixed overhead variance

Fixed overheads are absorbed using a predetermined rate:

Fixed overhead absorption rate (OAR) = budgeted fixed overhead / budgeted output (or hours).

Total fixed overhead variance = fixed overhead absorbed (OAR x actual output) - actual fixed overhead.

This matches the October 2017 mark scheme (absorbed £17,000 - actual £15,730 = £1,270 favourable). An adverse variance can come from spending more than budget or from producing less than budgeted, so fewer units absorb the overhead.

Reconciliation statement

Standard: variable overhead £3.00 per labour hour; budgeted fixed overhead £30,000 for 2,500 units (OAR £12.00 per unit). Actual: variable overhead £9,350; fixed overhead £29,000; output 2,000 units (the material and labour figures are from the previous lesson).

£
Standard cost of actual output89,000
Material variance£80 F
Labour variance£250 A
Variable overhead variance£350 A
Fixed overhead variance£5,000 A
Actual cost94,520

Reconciliation: favourable variances are deducted, adverse added

Interpreting

Here the fixed overhead variance of £5,000 A is mostly due to volume: only 2,000 of the budgeted 2,500 units were made, so 500 x £12.00 = £6,000 of overhead was not absorbed, while spending was £1,000 below budget.

Worked example

Calculate the total variable overhead variance and the total fixed overhead variance for the example.

  1. Standard variable overhead per unit = 1.5 hours x £3.00 = £4.50
  2. Variable: 2,000 x 4.50 - 9,350 = £350 A
  3. OAR = 30,000 / 2,500 = £12.00 per unit; absorbed = 2,000 x 12.00 = £24,000
  4. Fixed: 24,000 - 29,000 = £5,000 A

Answer: Variable overhead £350 A; fixed overhead £5,000 A

Key idea: Total variable overhead variance = standard variable overhead for actual output - actual; total fixed overhead variance = absorbed (OAR x actual output) - actual; reconcile standard cost of actual output to actual cost.

Check yourself

  1. Budgeted fixed overhead is £48,000 and budgeted output is 12,000 units. Calculate the fixed overhead absorption rate per unit.
    Show answer

    £4.00. 48,000 / 12,000 = £4.00 per unit.

  2. OAR £4.00 per unit; actual output 11,000 units; actual fixed overhead £46,500. Calculate the total fixed overhead variance (positive for favourable, negative for adverse).
    Show answer

    £-2500. Absorbed 44,000 - actual 46,500 = -£2,500: adverse.

  3. Standard variable overhead is £2.40 per unit. 5,000 units were made and actual variable overhead was £11,600. Calculate the total variable overhead variance (positive for favourable, negative for adverse).
    Show answer

    £400. 12,000 - 11,600 = £400 favourable.

  4. Variable overhead is absorbed at £5 per standard labour hour; each unit needs 0.5 standard hours. 8,000 units were made; actual variable overhead was £21,300. Calculate the total variable overhead variance (positive for favourable, negative for adverse).
    Show answer

    £-1300. Standard = 8,000 x 0.5 x 5 = 20,000; 20,000 - 21,300 = -£1,300: adverse.

  5. The standard cost of actual output is £64,000. Variances: materials £1,200 A, labour £800 F, variable overhead £300 A, fixed overhead £1,500 A. Calculate the actual cost.
    Show answer

    £66200. 64,000 + 1,200 - 800 + 300 + 1,500 = £66,200.

  6. Fixed overhead spending was exactly as budgeted, but output was below budget. What is the total fixed overhead variance?
    • Favourable, because spending was on budget
    • Adverse, because less overhead was absorbed
    • Zero, because spending was on budget
    • It cannot be calculated
    Show answer

    Adverse, because less overhead was absorbed. Absorbed overhead (OAR x actual output) is less than the actual overhead.

Practise with instant feedback

Sources

Last updated 8 November 2026. Spotted a mistake? Tell us.