Inventory (stock) includes raw materials, work in progress and finished goods. Holding the right amount is a balancing act between running out and tying up cash.

Practise this in the app: instant marking and a fix for every mistake. Free, no email needed to start.

Practise this lesson

The inventory control diagram

The diagram plots inventory level against time in a saw-tooth pattern:

The October 2024 WBS12 paper asked for a re-order quantity calculated as maximum minus minimum inventory.

FeatureValue
Maximum level1,200 units
Buffer inventory200 units
Usage150 units per day
Lead time3 days
Re-order quantity1,200 - 200 = 1,000 units
Re-order level200 + 150 x 3 = 650 units

Reading an inventory control diagram

Poor inventory control

Just in time (JIT)

JIT means materials arrive exactly when needed for production and finished goods are made to order, so little or no buffer inventory is held.

Waste minimisation and lean production

Lean production aims to use as few resources as possible: less inventory, less space, less time, less waste of materials and effort. Methods include JIT, kaizen (continuous improvement), cell production and quality at source. Waste minimisation covers reducing defects, overproduction, waiting time, unnecessary movement and excess inventory.

Competitive advantage: lower costs, faster response to customers, better quality, and an environmentally friendly image.

Worked example

Use the figures in step 1. Explain what happens if a delivery is 2 days late.

  1. The order is placed at 650 units; over the 3-day lead time 450 units are used, leaving the buffer of 200 when the delivery should arrive.
  2. A 2-day delay needs another 150 x 2 = 300 units, but the buffer holds only 200.
  3. The buffer lasts 200 / 150 = 1.3 days, so the firm runs out and is 100 units short before the delivery arrives.

Answer: The buffer covers only about 1.3 days of delay, so production stops (or sales are lost) for the rest of the 2 days; covering a 2-day delay would need a buffer of at least 300 units.

Key idea: Re-order quantity = maximum - buffer. Re-order level = buffer + usage x lead time. Too much inventory ties up cash; too little loses sales. JIT and lean production cut waste but depend on reliable suppliers.

Check yourself

  1. Golcar Fisheries holds a maximum of 12 sacks of potatoes and a minimum of 2 sacks (WBS12, October 2024). Calculate the re-order quantity.
    Show answer

    10 sacks. Maximum - minimum = 12 - 2 = 10 sacks, as in the mark scheme.

  2. Buffer inventory is 300 units, usage is 80 units a day and the lead time is 5 days. Calculate the re-order level.
    Show answer

    700 units. 300 + 80 x 5 = 700 units.

  3. Inventory is at the re-order level of 900 units and usage is 120 units a day. Buffer inventory is 300 units. What is the lead time in days?
    Show answer

    5 days. (900 - 300) / 120 = 5 days.

  4. A shop holds a buffer of 360 units and sells 45 units a day. For how many days could the buffer alone cover a late delivery?
    Show answer

    8 days. 360 / 45 = 8 days.

  5. Buffer inventory is held mainly to
    • take advantage of higher prices later
    • reduce storage costs
    • improve the acid test ratio
    • protect against late deliveries or unexpected demand
    Show answer

    protect against late deliveries or unexpected demand. It is a safety stock.

  6. Which is a disadvantage of just in time inventory?
    • More cash is tied up in inventory
    • Production stops if a supplier delivers late
    • Storage costs rise
    • More inventory goes out of date
    Show answer

    Production stops if a supplier delivers late. No buffer means no protection.

  7. Lean production aims to
    • hold as much inventory as possible
    • maximise the number of workers
    • make every product by hand
    • minimise the use of resources and waste
    Show answer

    minimise the use of resources and waste. Do more with less.

  8. Explain one drawback of holding too much inventory.
    Show answer

    It ties up cash that could be used elsewhere, worsening liquidity, and increases storage costs and the risk of goods becoming damaged, obsolete or out of date.. Cash tied up, storage costs, risk of waste or obsolescence.