Project management, successful projects and SMART targets

Edexcel IAL Information Technology · WIT13 2 hour written exam on data, enabling technologies and systems development

IT projects are notorious for running late and over budget. Project management gives a project structure and control. You need the need for project management, the characteristics of successful projects, and how to use and write SMART targets (spec 15.1.1 to 15.1.4).

Practise this in the app: instant marking and a fix for every mistake. Free, no email needed to start.

Practise this lesson

Why IT projects need project management

A project is a temporary piece of work with a defined start, end, goal and budget (for example, developing a new booking system).

Project management is planning, organising, monitoring and controlling the people, tasks, time, money and risks so the project achieves its aims.

It is needed because IT projects: involve many tasks that depend on each other; use limited people, money and equipment; face changing requirements; involve many stakeholders; carry technical risks; and must be finished by a deadline. Without it, there is scope creep (requirements keep growing), missed deadlines, overspending, poor quality and unhappy users.

The project manager balances the triple constraint: time, cost and scope/quality; changing one affects the others.

Characteristics of successful IT projects

SMART targets

Project outcomes should be written as SMART targets:

LetterMeaningQuestion to ask
SSpecificIs it clear exactly what will be achieved?
MMeasurableIs there a number or test that shows whether it has been met?
AAchievableCan it be done with the people, money and technology available?
RRelevant (or realistic)Does it support the project's and organisation's aims?
TTime-boundIs there a deadline?

Writing SMART targets

Weak: 'Make the website faster.'

SMART: 'By 31 March, reduce the average load time of the product pages from 6 seconds to under 2 seconds, measured by the monitoring tool over one week, using the existing hosting budget.'

Why SMART targets help: everyone knows exactly what success looks like; progress can be measured; unrealistic goals are avoided; the project can be judged at the end.

In the exam, each letter of a target you write should be clearly present: a measurable figure, a date and a specific outcome relevant to the scenario.

Worked example

Turn 'Improve the help desk system' into a SMART target for a college IT department.

  1. Specific: reduce the time to resolve student password resets.
  2. Measurable: from an average of 2 days to under 4 hours, measured from help desk logs.
  3. Achievable: by adding a self-service reset page with existing staff.
  4. Relevant: students lose lesson time when locked out.
  5. Time-bound: by the start of the spring term.

Answer: 'By the start of the spring term, introduce a self-service password reset so the average resolution time falls from 2 days to under 4 hours, as measured by help desk logs.'

Key idea: Project management controls time, cost, scope and risk. Successful projects: on time, on budget, meet requirements, clear objectives, user involvement, good planning and communication. Outcomes as SMART targets: specific, measurable, achievable, relevant, time-bound.

Check yourself

  1. Which target is SMART?
    • Make staff better at using computers
    • Train all 40 reception staff to use the new booking system by 30 June, with each passing a practical test
    • Train everyone eventually
    • Improve the system as much as possible
    Show answer

    Train all 40 reception staff to use the new booking system by 30 June, with each passing a practical test. It has a specific group, measure and deadline.

  2. 'Increase online sales by 15%' is missing which SMART element?
    • Measurable
    • Specific
    • Relevant
    • Time-bound
    Show answer

    Time-bound. There is no deadline.

  3. During a project, users keep adding new features, so the deadline slips. What is this called?
    • Data redundancy
    • Scope creep
    • Regression
    • Deadlock
    Show answer

    Scope creep. Uncontrolled growth in requirements.

  4. A client demands extra features but keeps the same deadline. According to the triple constraint, what is most likely to be needed?
    • Nothing changes
    • Fewer tests and no training
    • More cost (resources) or reduced quality
    • A smaller scope
    Show answer

    More cost (resources) or reduced quality. Scope, time and cost are linked.

  5. Which is a characteristic of a successful IT project?
    • Users are involved throughout, so the system meets their needs
    • Requirements are never written down
    • Testing is skipped to save time
    • Only the developers decide what is built
    Show answer

    Users are involved throughout, so the system meets their needs. User involvement is key.

  6. What makes a target 'measurable'?
    • It has a deadline
    • It is linked to company aims
    • It includes a figure or test that shows whether it has been achieved
    • It can be done with available resources
    Show answer

    It includes a figure or test that shows whether it has been achieved. Measurement shows success.

  7. Explain why project management is needed when developing a new IT system.
    Show answer

    IT projects have many interdependent tasks and limited time, money and people, so they must be planned, monitored and controlled to finish on time, within budget and meeting requirements.. Complexity and limits, so planning and control to meet time, cost, quality.